In planning · Thüringen

Breitenbich battery storage

Directly next to its own Breitenbich substation, the GERES-Group is planning a battery storage system with an output of 18 megawatts and a storage capacity of 40 megawatt hours.

Visualisation

The storage system uses lithium-ion technology from Huawei in a modular container design. It will be connected at 30 kilovolts to the substation, which is owned by the group itself. The site is secured, the grid operator has approved the feed-in, and the municipality supports the project.

A battery storage system takes up electricity when more is generated than consumed and releases it again later. This helps to keep the grid stable and means that wind farms need to be curtailed less often because of grid congestion.

Read the news item

Project timeline

Where the project stands

  1. Site secured

    Done

  2. Feed-in approved by the grid operator

    Done

  3. Planning

    In progress

  4. Construction

    Planned

  5. Commissioning

    Planned

What the region gains

As with the wind farms, part of the added value stays in the region: through municipal participation and through income from leases, taxes and local contracts.

More on municipalities and participation

Questions about this project?

Do you live nearby or represent the municipality? Write to us and we will reply personally.

Ask a question

More projects

All projects
  • Under constructionRheinland-Pfalz

    Siesbach Süd wind farm

    Three Enercon E-⁠138 turbines south of Siesbach. The infrastructure is in place, and the foundations are now being built. Commissioning planned for 2027.

  • PermittedThüringen

    Repowering of the Büttstedt wind farm

    Six modern turbines will replace seven first-generation ones. Permitted in March 2026, with construction planned to start in the fourth quarter of 2027.